Fourth Street Bridge Retrofit, CA
Design of OCS system for light rail operation with provisions for future trolley buses and for providing structural calculations and supports for three portals to support OCS wires.
Discovery Substation, OR
Engineering and design of 115kV/13.8kV substation involving electrical, civil and structural work.
Daly City Substation, CA
Replacement of four 12kV circuit breakers, upgrade of associated bus work, disconnect of switches and control, relay and alarm systems.
Sea-Tac International Airport Third Runway, WA
Electrical engineering, taxiway lighting, illuminated guidance signs, voltage regulators and utilities required to support runway/taxiway system.
Issaquah Transit Center and Parking Garage, WA
Design included 600A, 480V electrical service, a garage and transit center shelter, site and city street lighting, a 40-camera CCTV/security system, two elevators, a 50KW, 480/277V three phase standby generator and a garage wide fire alarm system.
Des Moines Marina CCTV Security, WA
Install a recording and monitoring center at the marina for 15 new cameras immediately and 100 cameras over time. New power packs and multiplexers installed on each dock to facilitate current and future cameras.