WSF Coleman Dock Multimodal Terminal Upgrade Study

Seattle, WA

  • Elcon provided the power upgrade study, which included load calculations, coordination with Seattle City Light and development of alternatives to show possible locations for the new electrical service.
  • The study included one-line diagrams, layouts of electrical rooms and major electrical equipment, and cost estimates for each alternative and a technical recommendation identifying a preferred design layout.