Transmission Line Study for Warm Springs Biomass Power Plant
Warm Springs, OR
- Elcon assisted Warm Springs Power & Water Enterprises in selecting the route of the transmission line and developing permits for an 18 MW Biomass Plant.
- Once the route was selected, aerial surveying was completed by Finley Engineering.
- Elcon determined that the transmission line should be a 795 kcm ASCR, 230kV line. The 230kV line construction will allow direct connection into the 230kV bus at Portland General Electric’s Round Butte substation.
- The line will provide additional capacity that may be used for future generation projects.