Slatt Substation 230kV/500kV

Washington

  • This project involved the expansion of the 500kV switchyard and construction of a new 230kV switchyard. This enabled the California-Oregon Intertie (COI) rating to be increased to 4800 MW and facilitated 846 MW of generation from Shepherds Flat Wind Farm to be interconnected with the BPA system.