Guilds Lake Pump Station
Portland, Oregon
This project included electrical upgrades to the existing pump station to increase its reliability and to extend its service life. Elcon provided electrical design of a 27 million gallon per day pumping station. This included a new:
- Standby diesel generator
- Variable Frequency Drives
- Medium Voltage Transformer
- Power Distribution System
- I&C Systems
