Outfall 27/Sellwood CSO Control

Portland, Oregon

This project included the design and installation of a new storm water collection pump station in Portland. Elcon provided the following design:

  • 500 KVA diesel-engine generator
  • 800 amp, 480 volt motor control center
  • Solid-state reduced voltage starter for 200 hp pumps
  • Three bubbler panels
  • Gas Detection & Odor Control Systems