H.J. Ashe Substation 500kV
Washington
This project involved improving the reliability and adding operational flexibility of the existing substation that originally was built in 1976.
It also included the developing of Bay 8 and allowing an outage of the Lower Monumental Ashe No. 1 500kV line without taking an outage of the north bus.
As part of the second task, the project involved modification of Remedial Action Scheme and modification of two 500kV MODs.