Utility & Power

Flathead Substation
MT

ELCON was responsible for the development of a relay system and control panels for a 230kV substation and the relocation of a control house. In addition, we separated an existing 230kV substation form a 34.5kV substation. Design also includes SCADA interface.

 

 

 