River Road Pump Station
Hillsboro, OR
ElLCON developed a preliminary and detailed design for this new pump station. The electrical design work included two 30-HP submersible pumps, motor control center, 150-kW stand-by generator, lighting, and provision for three 100-HP future dry pit pumps. Design was developed in compliance with CWS Standards. Construction specifications and cost estimates were also developed. Also provided assistance during construction and start up.