Water/Treatment Plants, Wells & Water/Stormwater Pump Stations

Sellwood Combine Shoot Overflow Control
Portland, OR

This project involves a new pump station that will provide storm water collection to prevent sewage overflow into the Willamette River during heavy rain periods. New electrical equipment was installed. This included 500 KVA standby generator set, two variable frequency drives for 200 hp pump motors and three bubbler level control panels, and gas detection/alarms and odor control systems.

Additional Project Experience

 

Project Experience

max Seattle King County Wastewater Facilities
Seattle, WA